With the safety railings moved safely out to the very edge and temporary lighting installed, the cement was poured for the second floor, or so we’ve been told. We’re waiting for the right opportunity to get up there and see the new floor for ourselves. Meanwhile, there’s sufficient photographic evidence to confirm that something like that probably happened.