We continue to inch closer to pouring the cement for the main floor. Expansion joint material was added to the perimeter of the rooms awaiting their concrete floor, and significant effort was made to ensure the gravel brought in for the floor’s base was graded to the correct elevation and slope.

At the same time, one lonely piece of floor was poured this week. The electrical utility room was the first main floor room to receive its floor.

20131020-090544.jpg

20131020-090656.jpg

20131020-090713.jpg

20131020-090735.jpg

20131020-090828.jpg

20131020-090849.jpg

20131020-090903.jpg

Advertisements

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out / Change )

Twitter picture

You are commenting using your Twitter account. Log Out / Change )

Facebook photo

You are commenting using your Facebook account. Log Out / Change )

Google+ photo

You are commenting using your Google+ account. Log Out / Change )

Connecting to %s