Week 14 in Review

A lot of exciting activities were coordinated this week. Here’s a quick recap of the events:

– Storm sewer plumbing crept farther underground toward its final destinations.
– A new utility pole made its debut in front of our building.
– Engineered sheathing material was installed on the exterior of the building.
– HVAC ducting began arriving on site.
– Incremental work was completed to further prepare the main level floors to receive concrete.
– Plywood sheeting began to appear on the front Volkswagen design elements.
– The electrical utility room was the first main floor area to have its concrete floor poured.

All of this represents very good progress for a four day week, during which we struggled under the effect of the tryptophan consumed at numerous Thanksgiving feasts!

20131020-111319.jpg

20131020-111449.jpg

20131020-111555.jpg

20131020-111640.jpg

20131020-111750.jpg

20131020-111808.jpg

20131020-111831.jpg

20131020-111854.jpg

Advertisements

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out / Change )

Twitter picture

You are commenting using your Twitter account. Log Out / Change )

Facebook photo

You are commenting using your Facebook account. Log Out / Change )

Google+ photo

You are commenting using your Google+ account. Log Out / Change )

Connecting to %s