Chalk Outlines

It’s time to check in on the second floor. Since we have seen some of the progress from the bottom looking up, we know much has been happening. What we discovered were chalk outlines of the walls that will divide the available space. In fact, steel studs have already been installed along many of the chalk outlines. It was exciting to see hallways, doorways and rooms that until now have only ever existed on paper drawings and computer screens.

20131027-235245.jpg

20131027-235342.jpg

20131027-235454.jpg

20131027-235515.jpg

20131027-235617.jpg

20131027-235633.jpg

20131027-235650.jpg

Advertisements

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out / Change )

Twitter picture

You are commenting using your Twitter account. Log Out / Change )

Facebook photo

You are commenting using your Facebook account. Log Out / Change )

Google+ photo

You are commenting using your Google+ account. Log Out / Change )

Connecting to %s