Stairing Contest

The material for a second set of stairs was delivered this week. As a result the floor that belongs under those stairs had to be poured by hand, and it was. At the same time, cement was poured by hand into the treads of the first set of stairs to bring them one step closer to going into operation. Although some assembly is still required for the second set of stairs, we are excited to have them on site. Once their installation is complete, that will be two stairways down (and up) and two more stairways left to go (up and down). The two remaining stairways belong in the rear entrance and in the parts department. Any guesses as to which one may appear next?

20131103-203120.jpg

20131103-203203.jpg

20131103-203221.jpg

20131103-203247.jpg

20131103-203255.jpg

Advertisements

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out / Change )

Twitter picture

You are commenting using your Twitter account. Log Out / Change )

Facebook photo

You are commenting using your Facebook account. Log Out / Change )

Google+ photo

You are commenting using your Google+ account. Log Out / Change )

Connecting to %s