Power Struggle

Work began on routing the power connection that will travel from the base of our new transformer into the power room in our new Volkswagen dealership. Sounds simple enough, right? Wrong.

There are very detailed engineering specifications that outline the configuration, path of travel, and material required to encase the cables that will feed power to Das Build. These requirements are all in the name of safety, so we heartily endorse each and every one.

20131202-224114.jpg

20131202-224142.jpg

20131202-224211.jpg

20131202-224331.jpg

20131202-224408.jpg

20131202-224425.jpg

20131202-224541.jpg

20131202-224604.jpg

Advertisements

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out / Change )

Twitter picture

You are commenting using your Twitter account. Log Out / Change )

Facebook photo

You are commenting using your Facebook account. Log Out / Change )

Google+ photo

You are commenting using your Google+ account. Log Out / Change )

Connecting to %s